Savings for Commercial and Industrial Customers
How the Commercial and Industrial Program Can Help Your Business
- You’ll be able to afford state-of-the-art, energy efficient equipment that can improve your building operations while saving energy and money.
- Incentives create new opportunities. Reinvest money saved back into your business where you need it most.
- Energy efficient buildings are more marketable.
- Enhance your brand’s image by becoming a leader in sustainability.
- Ensure your building stays up to code with local laws. Learn more.
Success Stories
Get inspired to make energy-saving upgrades by Commercial and Industrial businesses in NYC who have already benefited.
St. John’s University installed energy efficient steam traps using incentives that covered 76% of project costs.
Ways to Save
Prescriptive Rebate* | Custom Rebate |
Receive a fixed incentive rate for installing energy efficient equipment including:
|
Install a custom project to receive incentives based on the annual kWh or therms saved.
|
*Prescriptive incentive rates can be found in the Program Manual.
**Lighting incentives only available through April 30, 2024.
Last Call for Lighting
Prescriptive lighting incentives will no longer be included in the Commercial and Industrial Energy Efficiency Program soon.
Act now to take advantage of the current incentive offerings, comply with Local Law 97, and save on cost-effective, energy-efficient lighting.
Application Deadline: April 30, 2024
To submit a lighting project after May 1, 2024, please go through the Instant Lighting Incentive Program.
Limited Time Bonus Incentives
Planning Commercial or Industrial energy efficiency upgrades in 2024? You may qualify for additional cost savings and incentives.
Measures |
BONUS INCENTIVES |
KEY DEADLINES |
---|---|---|
Measures NATURAL GAS |
BONUS INCENTIVES Custom Gas Measures - Up to 40% |
KEY DEADLINES Project application package must be submitted by July 31, 2024. Installation and required documents must be completed by August 31, 2024.Projects must pass post-inspection by September 30, 2024. |
Measures ELECTRIC |
BONUS INCENTIVES Building Automation Systems (BAS) - up to 14% |
KEY DEADLINES Project application package must be submitted by May 31, 2024. Installation and required documents must be completed by July 31, 2024. Projects must pass post-inspection by August 31, 2024. |
Measures ADVANCED CONTROL |
BONUS INCENTIVES Advanced Controls for Heating Electrification - Up to 30% |
KEY DEADLINES 2024:
2025: |
How to Apply
- Read the Commercial and Industrial Program Manual for complete customer and participating contractor eligibility requirements.
- Complete an application.
- For the prescriptive incentive, please include any applicable tools and forms with your application.
Please review and reference the program tools, forms, and technical guidelines when completing your application.